The height/size of a man-made obstacle can change during its lifecycle - from planning, through construction, to completion and, in time, demolition. This information about construction status is important. Although not required by the PANS-AIM, it is required by the RTCA/EUROCAE specifications. Guidance to be providedprocess can sometimes be quite lengthy and as a result, some obstacles may need to be published which do not yet exist (i.e. planned) but which will do at a defined point in time or at least the protection area for them must be made available to allow for their construction. Consequently, information can be made available when the obstacle is still in planning or construction status. It should be noted that the position and height of an obstacle may be different during the planning/construction and when completed (e.g. removal of the crane)

ICAO provisions do not require information about the status of an obstacle, but EUROCAE ED-98C/RTCA DO-276C defines an attribute 'Status' that provides the following indications: “planned”, “under constructions” or “completed”.

In AIXM 5.1.1 the attribute constructionStatus of the class VerticalStructurePart can have the following values:

  • use the VerticalStructurePart.constructionStatus

Guidance to be provided: