This example is based on a real case situation - the reconstruction of taxiway TWY E adjacent to the main runway RWY 14L/32R in Siauliai aerodrome (EYSA), which was published in 2021 with an AIP SUP (attached):
This example is based on a real case situation - the reconstruction of taxiway TWY E adjacent to the main runway RWY 14L/32R in Siauliai aerodrome (EYSA), which was published in 2021 with an AIP SUP (attached):